M&T Bank Stadium | Maryland

City: Baltimore
State: Maryland
General Contractor: Gilbane Building Company

Excavation Shoring System for the M&T Bank Stadium Project

The Maryland Stadium Authority has announced a $430 million plan to renovate M&T Bank Stadium, home of the Baltimore Ravens, over the next three years. The upgrades will include the construction of the North Plaza, an open-air space designed for tailgating and concerts, with viewing areas, an indoor sports bar, and a 7,000-square-foot retail area. Additionally, The Blackwing will feature 10 luxury suites connected to a private club. The Gatehouse will feature two levels of social space, a large screen, and a rooftop deck with panoramic views of the city. These updates, along with other infrastructure improvements, aim to enhance the overall experience for fans.

Schnabel’s Excavation Shoring System

Schnabel faced several challenges before and during this project. There was heavy engineering oversight from the client prior to the start of the work and during the work. When onsite, the logistical challenges, included limited access to the construction site, which made moving heavy equipment difficult, working in tight spaces with other subcontractors, low overhead clearance, pumping shotcrete and grout long distances, unexpected equipment issues, and maintaining a clean stadium during operations.

These obstacles were addressed by closely coordinating with Gilbane and other subcontractors, and by adjusting the pile locations daily during drilling. When equipment broke down, Schnabel stayed on schedule thanks to support from their equipment division and vendors, who quickly mobilized additional drill rigs to the site. Schnabel’s R&D department also played a crucial role by designing custom soil nail drills for areas with limited access, developing the right grout mix for the project, creating a low drill head frame system, and assisting with testing programs for micropiles that were shorter than the design length.

Fast-Paced Schedule

The client set an aggressive timeline to ensure the stadium would be ready for the start of the 2024 NFL season. To meet these tight deadlines, Schnabel’s crew worked overtime and night shifts, while the R&D department ensured the most efficient methods were used. Schnabel’s equipment division also made sure the field team had the necessary tools to complete the job as quickly as possible.

Conclusion

Despite numerous operational and equipment challenges, Schnabel installed quality work within the timeframe allotted. Their earth retention work at M&T Bank Stadium will support the client’s efforts to upgrade the 26-year-old facility, enhancing the gameday experience for Baltimore Ravens fans.